Tuesday, December 3, 2024

Face Lift

 During the month of November we were able to do a much needed facelift to the Swope Memorial Maintenance Facility. Phase one of this project consisted of rearranging the inside of our shop as well as demolishing the outdated workbench to make room for a updated streamlined workbench/tool storage combination. 

Along with the new organization strategy we were also able to paint the inside of the shop. Our new three teared color scheme allows for the mitigation of multiple problems we faced with the last paint job of the shop. Thus allowing for a much brighter and cleaner look when it was all said and done.