Fall is a busy time of year for us.  It is the time of year when the cool season grass makes it recovery from the long hot summer.  So far this fall we have aerified, fertilized, and topdressed all the greens, fertilized the zoysia (fairways and tees) for the last time this season, seeded all thin areas in the rough with a slit seeder, and finally finished repairing #9 on the River Courses fairway bunker.  The above photo is of Rob aerifying the greens and the bottom photos are of some of the work that was done on 9 bunker. 



Removing all old contaminated sand

After pulling out old drainage we put in new and covered with pea gravel 

The finished project after we lowered the bunker faces to reduce washouts and added sand